Major Projects Completed
Philex Mining: Design and Construct Belt Conveyer System
Project involved design and construction of belt conveyor system for the processing plant of Philex Mining Corporation, the biggest copper mining company in the Philippines.
Conveyor Capacity : 1500
TPH Total Length : 54 meters
Belt Width : 1200mm
Apo Cement Corporation: Design and Construction of Refuse Derived Fuel (RDF) Belt Conveyor System
The project involved the design and construction of the belt conveyor system for Refuge Derived Fuel (RDF) at the Pre Heater plant of Apo Cement Corporation-Cemex Philippines Inc. (Naga Cebu- Plant Cement).
The RDF Belt Conveyor is designed to accommodates different types of refuge derived fuel such as scrap rubber , tires, plastic and rice husk it was also designed to eliminate spillages and dust. Installation and commissioning was also done by Beta Equipment.
Quezon Power Ltd.: Replacement of Slewing Gear Bearing (May 2007)
The project involved removal of the old bearing and installation of a new one for the Stacker/Reclaimer of Covanta Philippines Operating Inc./Quezon Power Ltd. coal-fired plant
Stacker/Reclaimer Capacity : 1500/750
TPH Bearing Size : 4.0M diameter; 300mm thickness
CADPI: Design, Rehabilitation and Construction of Belt Conveyor System
The project involved the design, rehabilitation and construction of belt conveyor systems for the Central Azucarrera de Don Pedro Inc. Sugar Manufacturing and Refinery Plant in Nasugbu, Batangas (November 2013).
Conveyor Capacity : 200 TPH Total Length : 190 & 220 meters Belt Width : 1800mm & 2000mm
Holcim La Union: Design and Construction of Weigh Feeder Belt
The project involved the design and construction of belt conveyor system for the Alternative Fuel Raw Material (AFR) at the Pre heater plant of Holcim Philippines Inc. La Union Plant Cement.
The design accommodates the processing of different types of alternative fuel scrap rubber , tires, plastic and rice husk. The conveyor system was installed with a frequency inverter to automatically change the speed of the motor. The conveyor system was also installed with a Weigh Scale to measure load capacity of the belt conveyor.
San Roque Hydro Electric/Dam Project: Conveyor System Construction (1999 - 2002)
The project involved the installation of mechanical components, belt protection devices (Rip Detection Systems), conveyor belt splicing/vulcanizing, system maintenance of process plants and hauling of conveyors for the construction of 300m (height) x 1,220m (length) earth dam. Total length of conveyor is 36 kms consisting of 24kms steel cord belt (ST1550 1800mmBW & ST 1200 1200mmBW) and 12 kms fabric belt (EP 315/3ply to EP1250/4ply). Belt width range from 600mm -2400mm
Dismantling of conveyor belts and mechanical components after completion of the project was also done by Beta Equipment.